微信群玩北京pk10

Zhangjiagang Aofeiling Machinery Co., Ltd.

Your current location: >> Home >> Products >> Beverage Filling Units >> Automatic Juice Beverage Filling Machine >> Automatic Juice Beverage Filling Machine
product list

product search:
Please enter the product name you are looking for in the input box below.

Product center
print Font scaling

More information of automatic fruit juice filling machine

  • Introduction of automatic fruit juice filling machine
  • The lid is conveyed to the lid sorter through the lid capper. After the lid is sorted, the lid enters the capping channel through the reverse lid recovery device with the opening upward. When there is a lid opening downward, the lid will enter the capping tube through the reverse lid recovery device and return The lid unscrambler can ensure that the lid from the lid unscrambler enters the lid sterilizing machine through the cover channel at the correct position to sterilize the inside of the lid. There is a photoelectric detection switch on the cover channel between the cover sterilizer and the cover sterilizer and the cover sterilizer and the host. The start and stop of the cover aligner is controlled by the accumulation of the lid on the cover channel.

Features of automatic fruit juice filling machine

  • 陶瓷 装置,以确保封盖质量。 Capping head adopts constant torque ceramic device to ensure capping quality.
  • It adopts an efficient cap unwinding system, with perfect cap feeding technology and protection device.
  • 底托 进瓶 方式 ,避免瓶口二次污染。 The filling system uses a bottom- feeding bottle to avoid secondary contamination of the bottle mouth.
  • Equipped with a complete overload protection device, which can effectively protect the safety of the machine and the operator.
  • The control system has functions such as automatic water level control, detection of missing lids, automatic stop of flushing bottles and output counting.
  • The bottle washing system uses high-efficiency cleaning spray nozzles produced by American Spray Co., which can be washed everywhere in the bottle.
  • Main electrical components, electronically controlled valves, inverters, etc. are imported to ensure the excellent performance of the whole machine.
  • All components of the pneumatic system are internationally renowned products.
  • The whole machine adopts advanced touch screen control to realize human-machine dialogue.

- 24 - 8型 PET 瓶纯水冲洗、灌装、封盖机,吸取了国外同类型产品的先进技术,性能稳定,安全可靠。 DGZ24-24-8 type PET bottle pure water washing, filling and capping machine has absorbed the advanced technology of the same type of foreign products, with stable performance, safety and reliability.

  • The machine has compact structure, perfect control system, convenient operation and high degree of automation;
  • 输送道 与进瓶拨轮直连技术, 采用 进瓶螺杆及输送链,变换瓶型简单容易。 Adopting the technology of direct connection between the conveying path and the bottle-feeding wheel, and the bottle-feeding screw and the conveying chain, it is easy to change the bottle shape. 输送道 进入机器后,由进 聚录乙烯拨轮 直接送至冲瓶机冲洗 After the bottles enter the machine through the conveyor, they are sent directly to the rinse machine by the feeding vinyl dial.

  • Sterile water bottle

After the bottle enters the host machine, it enters the bottle washing machine through the transmission star wheel. The bottle clamp clamps the bottle mouth and turns up 180 ° along the bottle washing guide rail to make the bottle mouth downward. 24 根管路分配至冲瓶夹),冲瓶夹喷嘴喷出无菌水,对瓶子内壁进行冲洗。 In the specific area of the bottle washer (determined by the water tray-the bottle water is pumped into the water tray by the water bottle pump, and then distributed by the water tray to the bottle holder through 24 pipes), the nozzle of the bottle holder is sprayed Rinse the inner wall of the bottle with sterile water. After the bottle is rinsed and drained, it is turned down along the guide rail and then turned 180 ° under the grip of the bottle clamp to make the bottle mouth upward. The washed bottles are exported from the bottle washer through the transition steel dial (pure water rinse bottle) and transferred to the next process-filling.

  • Filling

Bottles are lifted by cylinders during filling, which makes the high-speed operation stable and reliable. Compressed air is connected to the lifting cylinder through the air intake distributor. When working, the compressed air is injected into the cavity of the cylinder A through the air injection pipe, so that the cylinder rises upward. After the bottle mouth rises, the filling valve is opened to start filling. When the filling set level is reached, the return valve of the filling valve is blocked by the material and the filling is completed. Then the cylinder descends under the action of pulling down the cam. At this time, the gas in the B cavity is discharged through the exhaust screw.

  • Cover

After the filling is completed, the bottle enters the capping machine through the transmission star wheel. The stopper on the capping machine jams the bottleneck, and works together with the bottleneck guard of the capping machine to keep the bottle upright and prevent rotation. The capping head revolves and rotates under the driving of the main shaft of the capping machine. Under the action of the cam, the capping, capping, capping and removing operations are completed, and the entire capping process is completed.

The capping head adopts a magnetic constant torque device. When the capping head takes the cap through the capping disc, the cap covers the cap and straightens the cap to ensure the correct position of the cap in the capping mold and the capping quality. After the capping is completed, the capping head overcomes the magnetic force and will not damage the bottle cap. At the same time, the capping lever pushes the cap out of the capping mold when the capping head is raised.

The capping disc transmits power through the pin wheel and the capping head to ensure that its movement is synchronized with the capping machine. The bottle cap enters the capping disc through the capping channel, and then the cap transfer star wheel transfers the cap to the capping head separately. Cover.

Installation and commissioning

1. After the equipment arrives at the user's workshop, the user should make the equipment in place according to the floor plan provided;

2. The company will send experienced technicians to guide the installation, commissioning and trial production of the equipment; our company will adjust the equipment to the design capacity within the planned time;

3. During commissioning, the company is responsible for providing corresponding spare parts and accessories for free.

staff training

1. The Division is responsible for providing technical training to the buyer for free. Training content includes equipment structure and maintenance, equipment control and operation, etc .;

2. The training can be carried out at the buyer's site. The Division will appoint qualified technical personnel to guide and develop corresponding training outlines;

3. Through training, the buyer's technicians should be able to master the relevant operation and maintenance skills, adjust the process more skillfully, and deal with various faults in a timely manner.

Quality assurance

1. The company guarantees that the goods provided are brand new, unused, manufactured with new designs and suitable materials, and meet the quality, specifications and performance stipulated in the technical contract in all aspects;

2. The company guarantees that the production line will be put into operation within 3 days of the entire system after its correct installation and commissioning.

Make the equipment meet the technical performance indicators of the product;

3. The company guarantees that the design, process, manufacturing,

Installation, commissioning or material defects and all defects, failures and damages to the production line caused by the seller's responsibility;

4. The equipment quality guarantee period is 24 months after the acceptance of the production line. If during the quality guarantee period, the quality or specifications of the equipment is found to be inconsistent with the contract, or the equipment is found to be defective (including potential defects or the use of unqualified materials, etc.), the buyer has the right to work on the product according to the inspection certificate issued by the legal department. File a claim with the seller during the warranty period;

5. The company guarantees the mechanical performance of the equipment provided, the quality of the product and the consumption index of the product.

Equipment warranty

1. After the equipment is accepted, it provides a 24-month warranty and the control system provides a 12-month warranty. During the warranty period, our company will provide users with spare parts and timely and effective services for free;

2. If the equipment fails, it needs to be repaired on-site. Our company guarantees that the maintenance staff will rush to the customer's site within 48 hours to help customers troubleshoot in time (except force majeure);

3. After the warranty period, our company will provide customers with a wide range of preferential and sufficient after-sales service such as spare parts supply for life;

4. Our company provides users with comprehensive home services once or twice a year for free, and the time can be determined according to customer needs.

Domestic service outlets: Beijing, Xinjiang, Changchun, Jiangsu, Sichuan

Zhangjiagang Aofeiling Machinery Co., Ltd.

187 5117 0766 Liu

: Www.all-filling. . com

Address: Science and Technology Pioneer Park, Jinfeng Town, Zhangjiagang City, Jiangsu Province

scan it

Welcome to our website platform

contact us

Name: Zhangjiagang Aofeiling Machinery Co., Ltd.

Email: all-filling@foxmail.com

fax:

Postcode: 215600

Copyright Zhangjiagang Aofeiling Machinery Co., Ltd. Site Map ICP Record Number: 苏 ICP 备 16008938 号 -1
Food machinery equipment network production and maintenance

点击这里给我发消息
加拿大pc微信群玩法 赛车飞艇扫码群 老品牌幸运飞艇群 诚信pc微信群 哪里玩赛车pk10 哪里有微信群pk10 赛车pk10app群 北京赛车群哪个是实力群 北京赛车信誉微信群 北京pk10实力群